The Dream
- Dream your dream bathroom then - contact Bathroom Solutions.
- To assist with the creation of your dream bathroom we need to understand your likes, habits, requirements and your expectations.
- The creation of your dream bathroom will be a major investment in time and money.
- Determine the size and scope of your dream bathroom and prepare yourselves emotionally for the disruption ahead Throughout the process Bathroom Solutions will endeavour to maintain normality as much as possible for you.
The Design Process
- Contact Bathroom Solutions and arrange for a consultation with John or Marilyn at your home.
- Your dreams are discussed and notes taken of preferred fittings, wall linings, flooring, colours etc
- John or Marilyn will measure the existing area and check the plumbing and electrical for compatibility with your new fittings.
- Combining both Bathroom Solutions' experience and your dreams a concept and design is produced along with a preliminary proposal - Copies of the design and proposal along with brochures of suggested fittings is posted to you or delivered personally.
- A second meeting is often required to finalize and confirm the proposal.
Making Your Dream a Reality
- Once your decision is made to accept Bathroom Solutions proposal, final discussions take place to confirm colours, fittings and any minor adjustments required to the proposal.
- The accepted proposal now becomes a contract agreed to by both yourself and Bathroom Solutions.
- Deposit is paid, start date set and council consent (if required) is applied for. Bathroom Solutions set a program for their trades people and order materials to ensure the contract is underway on date specified.
- Now sit back and await your dream bathroom.
Note: Depending on the scope of work required a bathroom renovation will take between 3 to 6 weeks to complete. The bathroom will normally be operative in a temporary form within 2 days of demolition.